<div>On April 16, 2024, between approximately 4am and 5am, CIT Network Engineering will be migrating uplinks for the Goldwin node router. This is part of a project to upgrade network capacity and allow for growth within the core tier of the campus network. By migrating one core uplink at a time we can minimize impact but connectivity may be disrupted briefly. The managed server farm environment is not within the scope of this work. <br><br>Buildings served by the Goldwin Node router: <br>2008:Lincoln Hall <br>2017:Rand Hall <br>2004:Sibley Hall <br>2007:Tjaden Hall <br>2086:Johnson Art <br>2002:White Hall <br>2003:McGraw Hall <br>2013:Goldwin <br>2013A:Klarman Hall <br>2010:Uris Lib <br>2047:Olin Lib <br>2047a:Kroch Lib <br>2011:Stimson Hall <br>2026:Day Hall <br>2005:Sage Chapel <br>3802:Milstein Hall <br>2001:Morrill Hall <br>2017:Rand Hall <br>2015:Foundry</div>